#Roads & Transport
Target:
Cities of Belgrade & Bozeman, Gallatin County, & Montana Department of Transportation
Region:
United States of America
Website:
www.frontagepathway.com

The Golden Opportunity for a Belgrade to Bozeman Bike/Pedestrian Pathway is NOW!

Road improvements along Frontage Road between Belgrade and Bozeman Montana are currently in design and we don’t want to miss this once in a lifetime opportunity to add a pathway now or on future projects.

The Cities, County, and MDT need to know that this is vital – and smart.

Please sign the Petition!

Petition for Frontage Pathway

We the undersigned people of Gallatin County urge the Cities of Belgrade and Bozeman, Gallatin County, and the Montana Department of Transportation to work together to include a shared-use paved pathway on any projects upon the old U.S. 10 highway running from Bozeman through Belgrade (the frontage road).

To maximize safety, the pathway should be outside the edge of the paved shoulder and preferably beyond the drainage ditch along the side of the road. If necessary, additional right of way should be acquired.

This pathway should be incorporated in all construction and reconstruction projects on the highway including any that already are in planning and/or design.

The pathway should be extended as far west and east as possible and connected to other paths wherever feasible.

GoPetition respects your privacy.

The Belgrade to Bozeman Frontage Road Bike/Pedestrian Pathway petition to Cities of Belgrade & Bozeman, Gallatin County, & Montana Department of Transportation was written by Safer Bozeman and is in the category Roads & Transport at GoPetition.